Varnish 2

Done with both inside and outside, two times a layer of DD. Between them some sanding, especially on the spots that come in sight. The center part of the inside bottom has got some anti slip powder in the paint. Nice rough result, not glossy though.
All banks have two layers now and are like a mirror. Left over are the rudder and the spars. The rudder has to have the pintles. For the gudgeons I have to make the holes in the transom. I want to drill wider holes, fill it with epoxt and drill again, for a waterproff result. Then I have to fasten the center seat tot the trunk. It will probably be installed for good.

For the oars I bought some leather for the collars. It will prevent wear on the spots where the oars touch the oare locks. With was-oated nylon the collars will be stitched. The 'buttons' (that will keep the oars from sliding outboard through the oarlock) will be made of leather as well. A spiral 12 mm strip of leather around the oar. To determine the exact position, I have to get in the boat and sit on the seat. So, let's wait until the varnish is completely dry.

Reacties

Populaire posts van deze blog

Review

Filleting the joints

Epoxy